Install Day 3

Today has been a busy day putting up side supports and walls!  The underbelly of the Choir and Great Divisions are installed with hundreds of bolts, securing muffler boxes and intricate wiring panels to the windchests.  Toe boards and walk boards are installed while the shell goes up around it.

Install Day 2

Installation day 2 was filled with hoisting floor frames, windchests, and other materials to the choir loft.  A steel frame had be hoisted to the ceiling to allow a chain hoist to assist heavier items, such as the 800 lb Swell chest.